South Florida Construction Timetable for All Aboard Florida

In case you missed this, a good summary of Florida

PenneyVanderbilt

Well now we have the whole big construction schedule that Florida East Coast Railway will be doing for the new All Aboard Florida trains.

See the full article from the Sun-Sentinel.

Florida East Coast Railway construction schedule from Sun-Sentinel Florida East Coast Railway construction schedule from Sun-Sentinel

Some of the most interesting points are:

Railroad crossings, including 115 in Palm Beach County, 67 in Broward and 19 in Miami-Dade, will be rebuilt starting in early 2015 as a second track is laid down and new lights and gates are installed.

We just recently covered how FEC was “getting all its stations in a row

The entire corridor between Miami and West Palm Beach will be double-tracked starting early next year.

Some stretches, such as in downtown Fort Lauderdale, already have two tracks. But the tracks north of Broward Boulevard will shift slightly to accommodate the station.

A third track will be built at both the…

View original post 48 more words

Advertisement